Our Projects >> Bathroom 1...

We removed the old dated suite and the wall and floor tiles and built a partition wall to house the new wet room shower tray. The ceiling and walls were plastered prior to tiling. Hardibacker Boards were fitted to the floor and walls within the shower area and the walls were sealed with a Homelux Tanking Kit. We tiled the floor and walls within the shower area and behind the toilet and sink. A new toilet, sink, heated towel rail and roll top bath were then installed.

Some images of the project can be seen below: